| Stretch: | Above Etseri |
| Difficulty: | Class IV- to IV |
| Distance: | 8.6 miles |
| Flows: | No Gauge. Estimate at put-in: 1,800 cfs |
| Gradient: | 111 fpm average |
| Put-in: | Wooden Bridge across river |
| Take-out: | Bridge in the town of Etseri |
| Shuttle: | 13.8 kms (75 minutes one-way, rough dirt) |
| Season: | Spring and ? (Powerhouse will dewater this section by 2019) |
| Written: | © 2017 |