Stretch: | Lilly to Nemo |
Difficulty: | Class III to IV |
Distance: | 6.8 miles (1.5 on Clear Creek, 3.3 on the Obed, and 1.0 on the Emory) |
Flows: | 400 cfs (very low) to 10,000 cfs (or more). Check out American Whitewater's current flow gauge. |
Gradient: | 55 fpm (on Clear Creek) then 18 fpm |
Put-in: | Lilly Bridge on Ridge Road near Lancing |
Take-out: | Nemo Bridge on Catoosa Rd near Wartburg |
Shuttle: | 15.3 miles (35 minutes one way) |
Season: | Winter/Spring from rain |
Written: | © 2014 |